Projects
ETIHAD RAIL STAGE 2 PACKAGE 2C (Dubai) (ON GOING)
RM REEM MALL (COMPLETED)
DUBAI METRO ROUTE 2020 (COMPLETED)
THE DUBAI MALL ZA’ABEEL EXPANSION ZONE 14 (COMPLETED)
MOHAMMED BIN RASHID AL MAKTOUM CITY – DISTRICT ONE (COMPLETED)
R978/3A DEVELOPMENT OF CYCLE & JOGGING TRACK AT VARIOUS LOCATION IN DUBAI (COMPLETED)
CONSTRUCTION ONE VEHICLE UNDERPASSES & DUAL CELL CAMEL UNDERPASSES IN TAWEEN-SAADI EMIRATES ROAD
PD/CA/BPS/AG/R21/P147-2014-DOT/14/025 IMPROVEMENT OF MAFRAQ TO AL GHWEIFAT BORDER POST HIGHWAY SECTION 3B; AL MIRFA TO ABU AL ABYAD
PD/CA/BPS/AG/R21/P147-2014-DOT/14/026 IMPROVEMENT OF MAFRAQ TO AL GHWEIFAT BORDER POST HIGHWAY SECTION 3A; BAYNOUNAH FOREST TO AL MIRFA
CONSTRUCTION AND EXECUTION OF RAS AL KHAIMAH RING ROAD
T52/2011 – IMPROVEMENTS OF 5TH INDUSTRIAL INTERSECTION, SHARJAH RING ROAD INTERCHANGE & TIE IN WITH DUBAI
NATIONAL PAINTS INTERCHANGE
P573FZ – DEVELOPMENT OF GATE 4 IN JAFZA
AL MARJAN ISLAND CHANNEL CROSSING 2 - RAS AL KHAIMAH
SC/168 - CONSTRUCTION OF BRIDGE AT TAXI STATION JUNCTION & RAMPS - RAS Al KHAIMAH
SC/167- CONSTRUCTION OF BRIDGE & RAMPS @ ITHIHAD ROAD AIRPORT ROAD JUNCTION – RAS Al KHAIMAH
R881/2A - COMPREHENSIVE IMPROVEMENTS OF PARALLEL ROADS - NAD AL SHEBA
R842/1 - IMPROVEMENT OF AL KHAIL ROAD (AL KHAIL ROAD-EMIRATES ROAD JN.9)
R924/5 BEAUTIFICATION OF JUMEIRAH ROAD UPGRADING AND BEAUTIFICATION OF 2nd ZAABEEL ROAD
AL HAMRA VILLAGE BRIDGE WORKS - RAS AL KHAIMAH
R951/1B & 1C - INNOVATIVE TRAFFIC CONGESTION ALLEVIATION (IMPROVEMENT OF AL MAKTOUM BRIDGE)
DOT/C/HW/155/09 - KHALIFA PORT INTERCHANGE - ABU DHABI
DM/001- DUBAI METRO PROJECT - AT GRADE STRUCTURES, ELEVATED BRIDGES & RAMPS.
R842/6 IMPROVEMENTS OF AL KHAIL ROAD PHASE 6
This project was awarded to M/s. StructCon Roads Contracting LLC for the construction of bridges and MSE wall on Emirates Road. This project forms a part of “R842/6 Improvements of Al Khail Road Phase 6” where a link road is constructed between Sheikh Moh’d Bin Zayed Road and Emirates Road from DIP Roundabout.
This project was a challenging project as M/s. StructCon Roads had to construct the bridges over live traffic without affecting the flow. The project also consists of 17,000m² of MSE wall with 2km of coping parapet. The maximum height of MSE walls constructed is 16m.
M/s. StructCon Roads is in the verge of handing over the project.
Client: M/s. Roads and Transport Authority
MSE Wall
MSE Wall
MSE Wall
MSE Wall
Erection of Coping Beam
Bridge B01
MSE Wall
B01 Bridge Parapets
Precast Parapets
MSE Wall
Protective Coating
MSE Wall
MSE Wall
B02 Bridge
B02 Bridge
B02 Bridge finishing
B01-Deck over live traffic
MSE Wall
B01-Deck Works
Post Tensioning-B02
MSE Wall
B01-Deck over live traffic