Projects





ETIHAD RAIL STAGE 2 PACKAGE 2C (Dubai) (ON GOING)

Package 2C of Etihad Rail Network Stage 2 consists of approximately 96km of rail permanent way running north eastwards from Abu Dhabi /Dubai border to the Dubai/Sharjah border.
The scope includes construction of DMC and JBL Line as follows;
DMC Line: Construction of 2 bridges, 3 underpass and 4 culverts. Bridge at CH 6+648 is a construction of elevated 15 spans rail road under bridge and Bridge at CH 0+673 is a construction of elevated 4 spans rail road under bridge.
JBL Line: Construction of 2 bridges and 1 culvert. Bridge at CH 5+090 is a construction of elevated 21 spans rail road under bridge and Bridge at CH 10+168 is a construction of elevated 3 spans roadway over bridge.
 
The project is ongoing.